A wood flooring contractor’s responsibility is
not only a matter of professionally fitting the hard or softwood floor
to comply with best practice, but also to ensure that other trades have
correctly prepared the sub-floor and premises prior to work commencing. The sub-floor, being the foundation
of the wood floor, should not be compromised.
Sub-floor tolerances
Sub-floors must be inspected and tested to make sure that they are within
acceptable tolerance parameters. Both the flatness and levels of the sub-floor
must be within tolerance. The sub-floor moisture content must also be
measured with a BS 8203 hygrometer to ensure tolerances are met. The floor
installation team must also ensure that the environment in which the floor
is to be installed is within tolerance. Incorrect relative humidity percentages
and room temperatures will adversely affect an installation.
If the wood floor is being installed above an underfloor heating system,
the heating system must be correctly cycled prior to installation taking
place; this process alone can take up to two weeks. To see how to correctly prepare a sub-floor
click on the button below.
|